Hunt Electrical were contracted to undertake the full electrical installation of a local anaerobic digestion plant (AD Plant). This included the installation of all containment in the form of ladder and tray work, the pulling of cables ranging from 0.75mm to 400mm singles and terminating to the following equipment:
- 3200A switchboard
- Feed systems
- CHP (Combined Heat and Power)
- GEU (Gas Entry unit)
- Gas Compressors
- General plant and agitation system
- ATEX Pumps to Condensation Pit
And all associated controls, sensors and valves.